This entry will be a summary of what I have learnt in IA Design 3 class with Miss Sharmila from July untill October 2014.
Our first class begin on July, 8 and we had a brief of all three project that we will be doing through out this semester. All three project will be related to animals in Zoo Negara Malaysia.
The first thing we had to do is to choose one of the animal that exist in Zoo Negara.
So before we received the full brief of the projects we need to chose one animal and the animal I had choose is Giraffe.
Sleeping Baby Giraffe |
So the project for this semester consist of :
Project 1 : Conceptual Model
Project 2 : Micro Architecture
Project 3 : Visitor Center
The objective of the first project is to understand and to create the concept from the chosen object.
So based on the objective, I did a research on my chosen animal and learnt about their characteristic.
From all the characteristic we summarize it into design keywords such as Hierarchy, Rhythm, Irregular, Anti-90 degree and etc.
Description of Obvious Hide |
The second project is Micro Architecture.
For this project we had to go and do a site visit to Zoo Negara.
The objective of this project is to learn how to create an activity in a space.
Still involve with the chosen animal and we went to visit how they live in Zoo Negara.
So the brief of this project is to design Pavilion for visitor viewing area.
By using the characteristic and the conceptual model to create the Pavilion.
Presentation Board of Zoo Pavilion |
The final project is Visitor Center. The objective of this project is to learnt and to create the programme in space provided. So the brief of this project is to design the internal space of one existing building in Zoo Negara.
Existing Building; Administrative Office |
Final Presentation Board of Visitor Center |
Thank you.